Earned Value Management (EVM) SME/MS Project Scheduler

Employer
General Dynamics Information Technology
Location
Chantilly, VA
Posted
Aug 16, 2019
Closes
Aug 18, 2019
Ref
278820911
Hours
Full Time
General Dynamics is seeking a Senior Earned Value Management (EVM) Scheduler with Agile Development experience in any of the following locations: Washington, DCFalls Church, VAChantilly, VAThe ideal candidate for this position will possess an advanced knowledge of EVM, industry standards (EIA 748 current version), and scheduling using Microsoft Project.The responsibilities will include, but are not limited to the following:Perform schedule planning, development, maintenance, analysis, and reporting for multiple projects and/or proposalsBe experienced in developing proposal WBS/IMP/IMSResource-load and level Integrated Master Schedules (IMS)Have hands-on experience preparing and maintaining EVM/Scheduling artifacts such as: Control Account Plans (CAP), Work Breakdown Structures (WBS), Organizational Breakdown Structures (OBS), Basis of Estimates (BOE), Integrated Master Plans (IMP), Integrated Master Schedules (IMS), and Work Authorization Documents (WAD)Prepare the IMS for and conduct Schedule Risk Assessments using an automated Risk ToolUnderstand Agile development methodologies and how to model them in a project scheduleBe an advanced level user of Deltek, COBRA, wInsight, and Microsoft Project.Have experience in preparing for and participating in Integrated Baseline Reviews (IBR)Ensure Scheduling best practices and industry standards are being followedConduct internal EVM surveillancesDevelop weekly and monthly status and analysis reports including but not limited to critical path analysis, variance analysis, trending analysis, and major milestone reporting for program stakeholdersThe ideal candidate will:Work collaboratively in a dynamic and fast-paced environmentHave the ability to handle multiple competing priorities while delivering flawless client supportPossess excellent communication skillsPossess an advanced level of understanding of EVM, Project Scheduling industry standards, and best practicesBe an advanced level user of MS Project 2016, COBRA, and wInsightHave experience with WBS/IMP/IMS, EVM, resource loaded schedules, Schedule Risk Analysis (SRA), and critical path analysisPMP certification is desiredPMI-SP certification is desiredMinimum Years of Experience: 10 years For more than 50 years, General Dynamics Information Technology has served as a trusted provider of information technology, systems engineering, training, and professional services to customers across federal, state, and local governments, and in the commercial sector. Over 40,000 GDIT professionals deliver enterprise solutions, manage mission-critical IT programs, and provide mission support services worldwide. GDIT is an Equal Opportunity/Affirmative Action employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, or veteran status, or any other protected class.

Similar jobs